大学生a级毛片免费视频_中文日韩在线观看_中文字幕国_黄色午夜剧场_97人人草_中文字幕欧美日韩

Information
Hot
Contact us
Shanghai Youpeng Electromechanical Equipment Manufacturing Co., Ltd.
Fax: 021-69024199
Contact: Mr.Peng 
Mobile: 15021113195
E-mail: 502752248@qq.com
Address: No. 999, Zhongfa Road, Zhujing Town, Jinshan District, Shanghai
http://www.advup.cn/

 

Hunan Peng bathroom safe choice
Your location:Home>>Company dynamics

Daily maintenance of the transformer!

Release date:2018-12-20 17:12:31
In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
 
2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
 
3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
 
4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
 
5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
 
6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
 
7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
 
8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

Article keywords:
QR code
主站蜘蛛池模板: 天天热天天干 | 天堂一区 | 日本在线观看www | 免费看91的网站 | 91社区在线观看 | 国产精品精品久久久久久 | 国产一区二区三区久久悠悠色av | 182tv成人福利视频免费看 | 在线麻豆视频 | 国产综合免费 | 成年在线免费视频 | 亚洲欧美色诱惑 | 午夜小毛片 | 91高清视频在线 | 亚洲成人77777 | 九色网站在线观看 | 国产成人毛片 | 国产高清成人久久 | 国产成人午夜精品影院游乐网 | 中文精品一区 | 久久精品国产一区二区三区不卡 | 在线视频观看91 | 久久精品国产一区二区三区不卡 | 亚洲天堂一 | www.久久国产精品 | 97日日日| 亚洲国产成人久久综合一区,久久久国产99 | 国产一区二区三区免费观看在线 | 亚洲精品在线免费观看视频 | 日本成人网址 | 国产成人精品一区二区免费看京 | 91免费观看视频网站 | 国产日韩久久久久 | 国产电影久久久久久久 | 色翁荡息又大又硬又粗又视频图片 | 免费成人午夜视频 | a毛片在线看 | 91在线www| 国产日韩欧美一区二区久久精品 | 99亚洲天堂 | 色翁荡息又大又硬又粗又视频图片 |