Daily maintenance of the transformer!

Release date:2018-12-20 17:12:31
In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
 
2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
 
3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
 
4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
 
5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
 
6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
 
7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
 
8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

Article keywords:
QR code
主站蜘蛛池模板: 伊人色私人影院蜜桃va | 99热在线观看 | 国产免费一区二区三区四区五区 | 91嫩草影院在线观看 | 国产视频一区二区三区四区五区 | 一级片亚洲 | 久久久久又大又湿又高潮 | 91免费视频观看 | 成年在线免费视频 | 好男人久久 | 五月天婷婷色 | 亚洲手机免费视频 | 国产免费一区二区三区四区五区 | 懂色av中文一区二区三区 | 国产免费一区二区三区在线网站 | 99热最新网站 | 一级作爱视频免费观看 | 免费亚洲网站 | 一区二区三区四区久久 | 91视频高清免费 | 九九热免费在线视频 | 一区视频在线 | 亚洲精品在线视频观看 | 九一视频在线观看 | 91精品久久久久久久久入口 | 亚洲综合色视频在线观看 | 久久免费国产精品1 | www.国产精品.com | 久久久国产精品一区二区三区 | 国产区久久 | 午夜免费看毛片 | 男人精品天堂 | 69热国产视频| 国产成+人+综合+亚洲 欧美 | 国产一级毛片国语版 | 亚洲一区二区三区四区在线 | 91官网在线观看 | 777色狠狠一区二区三区 | 97国产情侣爱久久免费观看 | 亚洲中国字幕 | 91高清版 |