Daily maintenance of the transformer!

Release date:2018-12-20 17:12:31
In order to protect the insulation performance of the high-voltage generator and the insulating oil installed in the machine head, generally do not open the observation window and loosen the surrounding fixing screws to prevent the oil from absorbing moisture or falling dust and reducing the insulation performance.
 
2. Check the surrounding lighting, heat dissipation and dust removal equipment of the transformer, and wipe off the dust on the low-frequency toroidal transformer body and the porcelain bottle with a clean cloth.
 
3. Check the high-voltage side load switch of the transformer to ensure flexible operation, good contact, and lubrication treatment of the transmission part.
 
4. Pull open the high-voltage grounding knife and check that the grounding is in the disconnected position. Close the high-voltage load switch, let the transformer test run, and remove the high-voltage side identification plate. Pay attention to the high-voltage load switch when disconnecting or closing the transformer. There must be more than two people.
 
5. When it is necessary to replace the new oil, the local power department should be assisted to check the performance of the new oil, and the insulation strength should be no less than 25000 volts / 2.5 mm; and the oil insulation strength in the combined head should be 30,000 volts / 2.5 mm or more.
 
6. Measure the insulation resistance of the high and low voltage coils of the transformer (ground and phase) with a 2500V shaker. Confirm that the requirements are met. (At room temperature 30 °C, the high voltage side of the 1OKV ??transformer is greater than 20MΩ, and the low voltage side is greater than 13MΩ. Before the test, it should be connected. Good grounding wire, after the measurement is completed, it should be discharged.
 
7. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing, and the outer grounding wire are conducting, and tighten the grounding bolt.
 
8. The high voltage generator or the combined machine head must have a good grounding wire. Always use an ohmmeter to measure whether the outer casing, the console casing and the external grounding wire are conducting, and tighten the grounding bolt.

Article keywords:
QR code
主站蜘蛛池模板: 久99视频 | а天堂中文最新一区二区三区 | 亚洲视频国产精品 | 嫩草91在线| 91视频入口 | 在线麻豆视频 | 日韩精品手机在线 | 国产成人福利在线观看 | 九九成人 | 久久天堂网 | 久久久久久久久久久亚洲 | 国产精品毛片一区二区三区 | 偷拍成人一区亚洲欧美 | 免费观看麻豆视频 | 91视频高清免费 | 影音先锋91在线 | www.久久网站 | 91视频高清免费 | 一区二区在线不卡视频 | 九色视频在线观看 | 在线观看日韩视频 | 一本久道竹内纱里奈中文字幕 | 不卡一二区 | 干片网在线观看 | 亚洲国产精品视频一区二区 | 中文字幕一区二区不卡 | 天堂一区二区三区 | 91精品亚洲 | 99视频在线看 | 91国语| 91亚洲国产 | 亚洲美女在线一区 | 国产骚熟| 国产福利在线视频 | 午夜 国产 | 91免费视频网址 | 国产区二| 国产成人精品a视频一区www | 被下了药糟蹋h文 | 亚洲高清精品视频 | 久久精品国产一区二区三 |